Interconnection Process for Generation Systems
Interconnection Process for Generation Systems
Electrical distribution system design varies widely from that required to serve the rural member vs that needed to serve the large commercial member. In establishing a generation interconnection standard there are three main issues that must be addressed: Safety, Economics and Reliability.
The following documents have been prepared to explain the process to interconnect a Generation System with Cass County Electric. They contain general overview information including the process that needs to be followed in order to connect a generation system to CCEC's system as well as the technical requirements which need to be followed. The documents can be downloaded as one complete document or individually by sections. These sections are labeled as appendixes to the main process document. There are two forms which request data from a member who intends to interconnect a generation system to CCEC's system. Both of these forms can be downloaded in electronic form and the data blanks filled in electronically. If you have any questions regarding the interconnection of a generation system to CCEC's system, please call CCEC Transmission & Distribution Services Division at 701/356-4400 (toll-free at 1-800-248-3292 ) or email CCEC at info@kwh.com.
Entire Interconnection Process for Generation Systems Booklet
Application for Interconnection of Generation System
Engineering data Submittal for the Interconnection of Generation Systems